Cleanroom & contamination control
Cleanroom products: sporicides, IPA, and residues
Select cleaning products through the site approval process. Review contact time, compatibility, application, and residue removal for each area.
Cleanroom & contamination control
Coordinate cleaning with the site monitoring plan. Agree on access, room status, and work records with the quality team before service starts.

Interpret monitoring results alongside the room state, production activity and cleaning record. Coordinate sampling and cleaning under an approved plan.
ISO 14644-1 describes three room states that classify the conditions under which a cleanroom is assessed. Each has distinct implications for both environmental monitoring and cleaning program design.
As-built means the completed installation without production equipment, materials or personnel. Define pre-service cleaning and assessment in the qualification plan.
At-rest means equipment is installed and operating as agreed, without personnel present. It is a particle-classification state, not a surface bioburden criterion.
Operational means the installation functions as specified with the agreed personnel present. Define the conditions represented by sampling.

Environmental monitoring programs for classified manufacturing areas typically incorporate both viable and non-viable monitoring methods:
Surface sampling contributes evidence about contamination control. Review trends with personnel activity, methods, residues and cleaning records before assigning a cause.
Sampling timing affects what a result represents. Distinguish post-cleaning assessments from operational sampling. Do not change timing to obtain a favorable result.
Where timing problems arise: a cleaning cycle that occurs during an EM sampling window disturbs settle plates and generates aerosols from mopping activity. A cleaning cycle delayed until after EM sampling allows bioburden to accumulate on surfaces longer than the specification assumes. The two programs must be explicitly coordinated, not independently scheduled.

The coordination plan should address these elements:
Notify operations and quality staff when schedules change. Record actual times and assess departures from the plan.

Follow the approved investigation procedure for results exceeding a limit. The quality team should decide what evidence to collect and when to reclean. Preserve agent, method, personnel and deviation records.
Review unexplained trends through the quality system. Assess cleaning alongside other sources. Put changes under change control. See our GMP cleaning programs to discuss your scope.